concrete

November: Laying the foundation by Ben Sloan

IMG_0742.JPG

After many phone calls, ample head scratching, and understanding a 4" slump, the plan to pour concrete was in place. Under the guidance of Mike Moore (Creative Remodeling), and help from Ziyad Tooles, Matt Kotlarczyk, plus a crew of neighborhood kids, we knocked out. The whole process took about a week, squeezing steps in between teaching. The first task was to do a bit more digging of the foundation, just enough to create an even site for the pour. We followed that with the construction of a 12' x 12' frame, with rounded corners using luan. The gravel was delivered, shoveled into the frame, and tamped down. Just before the concrete arrived, we wet the ground to give us more time before the concrete cured. Lots of floating and troweling later, the slab was complete. For those interested in seeing the process, you can check out this time-lapse video.